and only use 2D drawings or static 3D models for lift planning for example. be documented with the use of form FD-8, Crane Operation. There is no universal or definitive answer for when a critical lift plan is required, but they are used as a precautionary step to protect load, people, and surrounding property. MULTIPLE CRANE LIFTS REQUIRE A SEPARATE LIFT PLAN FOR EACH CRANE, ANY CHANGES IN THE CONFIGURIAOTN OF THE CRANE, PLACMENT. Tower crane lift planning is important to timely provide resources to. A meeting to review of the specific Lift Plan (procedure and. gross deductions / chart capacity) for each specific crane configuration and location and activity (for example: unload a delivery truck is a separate activity from erecting steel).
Not all lifts are created equal, and for those lifts, we have critical lift plans. Crane Lift Plans must be based on worst case of capacity (i.e. This critical lift plan template is free to use and makes the job of completing and approving critical lifts faster, easier and more safe.